National Aquarium Rainforest Exhibit

Retail | Entertainment/Sports

Replacement of 684 pieces of glass in the skylight of the rainforest exhibit. Additional exterior work included new wave lighting, perimeter lighting at the skylight and roof replacement. Work inside the exhibit included concrete spall repairs, steel catwalk, composite decking, bird wire replacement, ductwork repairs, misting system replacement, painting, and interior lighting.  Additionally, P-C did back-of-house work, including adding a restroom and shower, painting walls, epoxy flooring and new counters.